{"id":28281,"date":"2024-05-21T12:28:58","date_gmt":"2024-05-21T10:28:58","guid":{"rendered":"https:\/\/next-tech.com\/?p=28281"},"modified":"2024-05-21T12:32:02","modified_gmt":"2024-05-21T10:32:02","slug":"guide-to-effective-project-planning","status":"publish","type":"post","link":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/","title":{"rendered":"A Guide to Getting Construction Planning Right"},"content":{"rendered":"<p><span style=\"font-weight: 300;\">If the project is the beating heart of every construction company (where they make and lose money), construction planning is the system of electrical signals that keep it beating.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Effective construction planning keeps all the requirements for a project on track.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Projects can be huge, and contain up to thousands of moving parts, so without a good planning strategy, including things like construction scheduling, projects will inevitably run overtime, over budget and cause everyone working on a project significant stress.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">In other words: lack of effective construction planning means projects are mired in waste, and have a low chance of making a profit.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">A lot of construction companies are still stuck in old, inefficient methods of planning, such as manual scheduling, documentation and cost planning.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">This is causing more profitless construction projects than ever in the industry. Data reveals that profit margins from construction projects have been diminishing for the past six years, now hovering between 1-2%.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Additionally, a staggering <\/span><a href=\"https:\/\/www.strategy-business.com\/article\/Why-do-large-projects-go-over-budget\"><span style=\"font-weight: 300;\">91% of projects exceed their budget constraints<\/span><\/a><span style=\"font-weight: 300;\">, which significantly contributes to about half of all projects ending up unprofitable.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">If ambitious construction companies want to mitigate these financial risks and make a profit, the need for robust, adaptive and comprehensive construction planning is crucial.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">In this guide, we\u2019ll go over:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">What construction planning is<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">What goes into a construction planning process<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">What can go wrong in construction planning management<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">Construction planning techniques to mitigate issues<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 300;\">Let\u2019s dive in.<\/span><\/p>\n<h2><b>What is construction planning<\/b><\/h2>\n<p><span style=\"font-weight: 300;\">So, what is construction planning and how does it work?<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Construction planning is the process of organising all the stages, tasks and jobs of the construction project lifecycle so that teams can accurately track and maintain control over their projects.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Construction planning is a collaborative process led by project managers, along with engineers and architects, who play crucial roles.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">They define the project scope, develop schedules, estimate costs, and coordinate the procurement of resources. Additionally, they manage stakeholder communication and ensure compliance with legal and regulatory requirements.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Effective construction planning involves these professionals working in concert to align project objectives with practical execution, enhancing efficiency and ensuring successful outcomes.<\/span><\/p>\n<h2><b>Things that go into a construction planning process<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-22228\" src=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-1030x644.jpg\" alt=\"\" width=\"776\" height=\"485\" srcset=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-1030x644.jpg 1030w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-300x188.jpg 300w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-768x480.jpg 768w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-1536x960.jpg 1536w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-1500x938.jpg 1500w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4-705x441.jpg 705w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-4.jpg 1920w\" sizes=\"auto, (max-width: 776px) 100vw, 776px\" \/><\/p>\n<p><span style=\"font-weight: 300;\">Within the construction planning process, jobs that need to be done are:<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Define your project<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">This should be the first step of your construction project planning process. Establish what the goals and purpose of the project is, including a plan on how you are going to achieve those goals. You should also map out who your stakeholders are.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">In this stage, you should also determine what the return on investment of the project is for your business (profit gain \/ loss)<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Map all the activities that need to be done<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">Breakdown, name and structure all of the tasks that are needed to complete your project. This should also include the milestones you need to reach along the way<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Material Takeoff (MTO)<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">This is a list of all materials you\u2019ll need for a project. It\u2019s crucial for accurate cost estimation, procurement and preventing delays and project overruns.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Determine a construction estimate<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">Assign costs to your list of construction materials created in the MTO.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Resource scheduling\u00a0<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">Resource scheduling is vital for the success of your project. It makes sure each activity has the right workers allocated at the right time and that you have the correct materials and equipment.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">It gives you a timeline to prep and execute each task and job at the correct time.<\/span><\/p>\n<ul>\n<li aria-level=\"1\"><b><i>Identify permissions<\/i><\/b><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">Identifying permissions in a construction planning process is crucial because it ensures compliance with legal and regulatory requirements. This helps avoid legal disputes, fines, and project delays, ensuring smooth project execution and adherence to safety and zoning standards.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">These planning jobs run across all stages of a construction project, from development and planning, to post-construction.<\/span><\/p>\n<h3><b>Cost planning in construction projects<\/b><\/h3>\n<p><span style=\"font-weight: 300;\">Effective cost planning in construction is more than just a preliminary step; it&#8217;s a cornerstone of successful project management.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Whether you call it cost planning in construction, construction cost planning, or construction finance management, the principles remain the same: it is essential for maintaining control over financial expenditures and ensuring operational efficiency throughout the lifecycle of a project.<\/span><\/p>\n<h4><b>Why cost planning is vital<\/b><\/h4>\n<p><span style=\"font-weight: 300;\">At its core, construction cost planning involves a detailed outline of all expected expenses before the first brick is laid.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">This foresight not only helps in forming a realistic budget but also provides a benchmark against which actual costs are measured as the project progresses. This continuous comparison between estimated and actual costs is crucial for spotting budget overruns early and allows for timely adjustments.<\/span><\/p>\n<h4><b>Finance management in construction<\/b><\/h4>\n<p><span style=\"font-weight: 300;\">Managing finances effectively goes beyond keeping a project under budget. It encompasses strategic allocation of resources, ensuring money is spent wisely to maximise value.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">For example, through construction finance management, a project manager can decide whether to invest in high-quality materials upfront to reduce maintenance costs down the line, balancing immediate costs with long-term benefits.<\/span><\/p>\n<p><b>Operational efficiency<\/b><\/p>\n<p><span style=\"font-weight: 300;\">The impact of robust cost planning extends into operational realms. With a clear financial roadmap, project managers can streamline processes, reduce waste, and schedule work more effectively.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">This efficiency not only helps in avoiding delays\u2014a common pitfall in construction projects\u2014but also in enhancing overall productivity.<\/span><\/p>\n<h2><b>What can go wrong in construction planning management<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-20116\" src=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-1030x644.jpg\" alt=\"\" width=\"784\" height=\"490\" srcset=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-1030x644.jpg 1030w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-300x188.jpg 300w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-768x480.jpg 768w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-1536x960.jpg 1536w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-1500x938.jpg 1500w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2-705x441.jpg 705w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/hero-2.jpg 1920w\" sizes=\"auto, (max-width: 784px) 100vw, 784px\" \/><\/p>\n<p><span style=\"font-weight: 300;\">Every project of any size has a plan, but construction planning management can be plagued by a common set of challenges that can derail projects, leading to financial losses, delays, and high levels of stress among teams.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">More often than not, these project planning challenges come down to lack of connected construction data, no real-time visibility and decision paralysis.<\/span><\/p>\n<h3><b>Inadequate real-time visibility<\/b><\/h3>\n<p><b>Outdated information:<\/b><span style=\"font-weight: 300;\"> Traditional construction planning often relies on periodic updates rather than real-time data. This means that by the time project managers view the reports, the information is already outdated, leaving them making decisions based on past circumstances rather than current realities.<\/span><\/p>\n<p><b>Impact of delays unseen:<\/b><span style=\"font-weight: 300;\"> Without real-time data, delays in one segment can cascade through the project without immediate visibility. This lack of insight makes it difficult to mitigate issues before they expand into critical problems.<\/span><\/p>\n<h3><b>Data silos and integration issues<\/b><\/h3>\n<p><b>Disconnected systems:<\/b><span style=\"font-weight: 300;\"> Many construction projects use a variety of digital tools that do not communicate with each other effectively. This results in data silos where information is isolated, making it hard for project managers to see the big picture.<\/span><\/p>\n<p><b>Compromised decision making:<\/b><span style=\"font-weight: 300;\"> When data lives in silos, the interconnected impact of decisions on different aspects of the project\u2014like resource allocation affecting the budget or schedule adjustments impacting procurement\u2014remains obscured.<\/span><\/p>\n<h3><b>Stress and decision paralysis<\/b><\/h3>\n<p><b>Burnout from inefficiency:<\/b><span style=\"font-weight: 300;\"> Constantly dealing with emergencies and unforeseen changes can lead to burnout among construction teams. The stress of managing a project without a clear, integrated view of all activities leads to panic, fear, and inefficiency.<\/span><\/p>\n<p><b>Reactive rather than proactive management: <\/b><span style=\"font-weight: 300;\">The lack of visibility into real-time data forces teams to operate reactively. They&#8217;re constantly putting out fires rather than preventing them, which can lead to suboptimal decisions that compromise project success.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Without the ability to see and adjust to real-time project data and impacts, projects frequently exceed budget constraints.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">This is a significant contributor to the trend of diminishing profit margins in the construction industry, with many projects failing to meet financial expectations.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">The cumulative effect of these planning failures is not just financial; it also affects the morale of the team and satisfaction of stakeholders. Continuous issues and lack of control can leave all parties frustrated, questioning the feasibility of project timelines and quality.<\/span><\/p>\n<h2><b>Construction planning techniques to mitigate issues<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-19366\" src=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/next_tinnerohem_28maj_0354-e1636536481304.jpg\" alt=\"\" width=\"784\" height=\"523\" srcset=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/next_tinnerohem_28maj_0354-e1636536481304.jpg 1000w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/next_tinnerohem_28maj_0354-e1636536481304-300x200.jpg 300w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/next_tinnerohem_28maj_0354-e1636536481304-768x512.jpg 768w, https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/next_tinnerohem_28maj_0354-e1636536481304-705x470.jpg 705w\" sizes=\"auto, (max-width: 784px) 100vw, 784px\" \/><\/p>\n<p><span style=\"font-weight: 300;\">So, what construction planning techniques can solve these issues?<\/span><\/p>\n<h3><b>Breaking down data silos<\/b><\/h3>\n<p><span style=\"font-weight: 300;\">By adopting an integrated construction project management approach, teams can centralise all aspects of a project, from initial quotes to final billing, into one cohesive platform. This method enhances project visibility and ensures all construction data is interconnected, allowing for deep analytics and proactive adjustments across different project stages.<\/span><\/p>\n<h3><b>Real-time data access<\/b><\/h3>\n<p><span style=\"font-weight: 300;\">Embracing systems that provide real-time data (we call it data in motion) transforms planning techniques in construction management. This approach enables managers to see the continuous flow of project activities, adjust dynamically to changes, and understand the real-time status of the project, thereby mitigating risks before they become costly issues.<\/span><\/p>\n<h3><b>Interconnected resource scheduling<\/b><\/h3>\n<p><span style=\"font-weight: 300;\">You need to have 100% control of the resources in your projects. <\/span><a href=\"https:\/\/next-tech.com\/en\/solutions\/next-construction-project-management-planning\/#:~:text=Now%20you%20can%20have%20100,more%20manpower%2C%20equipment%2C%20etc.&amp;text=Book%20an%20unconditional%20demo%20to%20explore%20our%20offering.\"><span style=\"font-weight: 300;\">A tool that allows for smooth, dynamic resource scheduling<\/span><\/a><span style=\"font-weight: 300;\"> is the key to success.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">It should enable you to not only get a full overview of the project, but show how changes to each aspect of a project affects the timeline and budget, like:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">Personnel and equipment<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">Holiday periods, milestones and deadlines<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">Staff occupancy<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><span style=\"font-weight: 300;\">And more<\/span><\/li>\n<\/ul>\n<h3><b>Choosing the right software for construction planning and scheduling<\/b><\/h3>\n<p><span style=\"font-weight: 300;\">Choosing the right construction planning and scheduling software isn&#8217;t just an operational decision; it&#8217;s a strategic one that significantly influences the success of every construction project.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Effective software not only streamlines processes but also provides critical, real-time insights that can make or break a project&#8217;s profitability and timeline.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">For construction companies striving to overcome these challenges, selecting the right software for construction planning is paramount. Next\u2019s planning tool exemplifies a powerful solution that integrates every aspect of construction project management into a single platform.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">That\u2019s where Next comes in.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Our planning tool gives you:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><b>Agile and real-time control:<\/b><span style=\"font-weight: 300;\"> Our planning tool offers a drag-and-drop scheduling interface, allowing for agile and real-time adjustments to the project timeline. This feature ensures that all team members are up-to-date with the latest project developments.<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><b>Comprehensive visibility:<\/b><span style=\"font-weight: 300;\"> With features like customisable views for dependencies, resource allocations, and cost projections, Next helps project managers maintain comprehensive oversight over their projects. This kind of visibility is crucial for detecting potential delays or budget issues early.<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><b>Efficient collaboration:<\/b><span style=\"font-weight: 300;\"> The tool facilitates efficient communication across the team and with clients. Schedules can be exported as PDFs or shared via online links, ensuring that everyone involved is informed about the project status without delays.<\/span><\/li>\n<li style=\"font-weight: 300;\" aria-level=\"1\"><b>Ease of use:<\/b><span style=\"font-weight: 300;\"> Accessible online with no need for downloads or installations, Next can be quickly implemented into any project\u2019s workflow.\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 300;\">We\u2019re currently offering a <a href=\"https:\/\/next-tech.com\/en\/solutions\/next-construction-project-management-planning\/\">free 30-day trial<\/a> of our planning tool, making it a low-risk, high-reward solution for construction companies eager to improve their project management practices.<\/span><\/p>\n<p><span style=\"font-weight: 300;\">Want to find out more first? Get a <a href=\"https:\/\/next-tech.com\/en\/book-demo-next-experts\/\">free demo<\/a> or chat to one of our construction experts.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If the project is the beating heart of every construction company (where they make and lose money), construction planning is the system of electrical signals that keep it beating. Effective construction planning keeps all the requirements for a project on track.\u00a0 Projects can be huge, and contain up to thousands of moving parts, so without [&hellip;]<\/p>\n","protected":false},"author":28,"featured_media":24729,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[89],"tags":[],"class_list":["post-28281","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>A Guide to Getting Construction Planning Right | NEXT<\/title>\n<meta name=\"description\" content=\"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A Guide to Getting Construction Planning Right\" \/>\n<meta property=\"og:description\" content=\"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"NEXT\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Nextonetechnology\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-21T10:28:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-21T10:32:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"662\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ifan Kaldain\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ifan Kaldain\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/\"},\"author\":{\"name\":\"Ifan Kaldain\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#\\\/schema\\\/person\\\/433f73a4c1b0e24eea744ac2bd092f77\"},\"headline\":\"A Guide to Getting Construction Planning Right\",\"datePublished\":\"2024-05-21T10:28:58+00:00\",\"dateModified\":\"2024-05-21T10:32:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/\"},\"wordCount\":1743,\"publisher\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Resource-and-Task-Management-Cropped.jpg\",\"articleSection\":[\"Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/\",\"url\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/\",\"name\":\"A Guide to Getting Construction Planning Right | NEXT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Resource-and-Task-Management-Cropped.jpg\",\"datePublished\":\"2024-05-21T10:28:58+00:00\",\"dateModified\":\"2024-05-21T10:32:02+00:00\",\"description\":\"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Resource-and-Task-Management-Cropped.jpg\",\"contentUrl\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Resource-and-Task-Management-Cropped.jpg\",\"width\":1920,\"height\":662},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/guide-to-effective-project-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/next-tech.com\\\/en\\\/next-construction-project-management-real-time\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A Guide to Getting Construction Planning Right\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/next-tech.com\\\/en\\\/\",\"name\":\"Next | Powered by Aceve\",\"description\":\"Tidrapport, Arbetsorder och Projekt i Bygg och Entreprenadbranschen. - Next One Technology AB\",\"publisher\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/next-tech.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#organization\",\"name\":\"Next | Powered by Aceve\",\"url\":\"https:\\\/\\\/next-tech.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/250109_Logos_Next-2.png\",\"contentUrl\":\"https:\\\/\\\/next-tech.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/250109_Logos_Next-2.png\",\"width\":3140,\"height\":1222,\"caption\":\"Next | Powered by Aceve\"},\"image\":{\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Nextonetechnology\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/nextonetechnology\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/next-tech.com\\\/en\\\/#\\\/schema\\\/person\\\/433f73a4c1b0e24eea744ac2bd092f77\",\"name\":\"Ifan Kaldain\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"A Guide to Getting Construction Planning Right | NEXT","description":"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/","og_locale":"en_US","og_type":"article","og_title":"A Guide to Getting Construction Planning Right","og_description":"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.","og_url":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/","og_site_name":"NEXT","article_publisher":"https:\/\/www.facebook.com\/Nextonetechnology","article_published_time":"2024-05-21T10:28:58+00:00","article_modified_time":"2024-05-21T10:32:02+00:00","og_image":[{"width":1920,"height":662,"url":"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg","type":"image\/jpeg"}],"author":"Ifan Kaldain","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ifan Kaldain","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#article","isPartOf":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/"},"author":{"name":"Ifan Kaldain","@id":"https:\/\/next-tech.com\/en\/#\/schema\/person\/433f73a4c1b0e24eea744ac2bd092f77"},"headline":"A Guide to Getting Construction Planning Right","datePublished":"2024-05-21T10:28:58+00:00","dateModified":"2024-05-21T10:32:02+00:00","mainEntityOfPage":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/"},"wordCount":1743,"publisher":{"@id":"https:\/\/next-tech.com\/en\/#organization"},"image":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg","articleSection":["Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/","url":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/","name":"A Guide to Getting Construction Planning Right | NEXT","isPartOf":{"@id":"https:\/\/next-tech.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#primaryimage"},"image":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg","datePublished":"2024-05-21T10:28:58+00:00","dateModified":"2024-05-21T10:32:02+00:00","description":"Discover effective construction planning techniques to optimise your projects and ensure profitability with our guide.","breadcrumb":{"@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#primaryimage","url":"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg","contentUrl":"https:\/\/next-tech.com\/wp-content\/uploads\/2024\/02\/Resource-and-Task-Management-Cropped.jpg","width":1920,"height":662},{"@type":"BreadcrumbList","@id":"https:\/\/next-tech.com\/en\/guide-to-effective-project-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/next-tech.com\/en\/next-construction-project-management-real-time\/"},{"@type":"ListItem","position":2,"name":"A Guide to Getting Construction Planning Right"}]},{"@type":"WebSite","@id":"https:\/\/next-tech.com\/en\/#website","url":"https:\/\/next-tech.com\/en\/","name":"Next | Powered by Aceve","description":"Tidrapport, Arbetsorder och Projekt i Bygg och Entreprenadbranschen. - Next One Technology AB","publisher":{"@id":"https:\/\/next-tech.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/next-tech.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/next-tech.com\/en\/#organization","name":"Next | Powered by Aceve","url":"https:\/\/next-tech.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/next-tech.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/next-tech.com\/wp-content\/uploads\/2025\/03\/250109_Logos_Next-2.png","contentUrl":"https:\/\/next-tech.com\/wp-content\/uploads\/2025\/03\/250109_Logos_Next-2.png","width":3140,"height":1222,"caption":"Next | Powered by Aceve"},"image":{"@id":"https:\/\/next-tech.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Nextonetechnology","https:\/\/www.linkedin.com\/company\/nextonetechnology\/"]},{"@type":"Person","@id":"https:\/\/next-tech.com\/en\/#\/schema\/person\/433f73a4c1b0e24eea744ac2bd092f77","name":"Ifan Kaldain"}]}},"_links":{"self":[{"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/posts\/28281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/comments?post=28281"}],"version-history":[{"count":0,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/posts\/28281\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/media\/24729"}],"wp:attachment":[{"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/media?parent=28281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/categories?post=28281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/next-tech.com\/en\/wp-json\/wp\/v2\/tags?post=28281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}